A4: Extend Cayuga St Protected Bike Lane (Lincoln St to Downtown)
Protect existing bike lanes or combine into two-way cycle track on northbound side.
A2: Extend Trail on Boynton Middle School Grounds
Improve wayfinding on ICSD property and add additional sidewalk north of parking lot to connect with East Shore Drive and Project A1.
F4b: Establish Buttermilk Falls Shared-Use Entryway
Widen and pave existing footpath from Spencer Rd to Buttermilk Falls State Park parking lot, complete with signage
F1: Repave Plain and Wood St. Bike Boulevards
Repave bike boulevards to provide a safe riding surface
A1: Build NY Route 13 Underpass Shared-Use Trail
Convene a taskforce between NYSDOT, Town of Ithaca, CWT, ICSD, and City of Ithaca. Upgrade gravel walkway to 11+ feet wide sidewalk, tighten all turning radii, and add lighting and public art where feasible.
B1: Improve Dey, Third St Route 13 Crossings
Improve safety at these Route 13 intersections by adding bike/ped signal priority, tightening turning radii, and hardening medians. Consider protected bicycle crossing at Third St due to heavy bike and pedestrian flows during market hours.
C1: Repave Adams St & Madison St Bike Boulevard
Repave Adams and Madison Streets after utility trenching damage plus wear and tear, and repaint bicycle boulevard road markings to improve visibility of route.
E3: Build Six Mile Creek Trail (Wegmans to Plain St)
Connect Wegmans driveway to S Plain St with protected bike lane or shared use trail. Improve safety by adding signal priority and diverter at Meadow St. Repave parts of S Plain St.
F2a: Fairgrounds Memorial Protected Bike Lane
Build two-way cycle track from Walmart to Meadow St. using one lane.
A3: Pilot Test Cayuga St Protected Bike Lane (IHS to Lincoln St.)
Pilot test protected bike lane (either two-way or one on each side) and improve connection to IHS-Boynton Trail.
B3: Cascadilla Street Protected Bike Lane
Pilot test a two-way protected bike lane on north side of Cascadilla St from Cayuga St to the new Greenstar, keeping in mind complex turning needs at Cayuga St and Northside-Southside route intersections.
C3: Improve Major Crossings of Plain St Bike Boulevard
Chip seal or repave Plain St along most of this stretch. Improve intersection safety by adding diverters, painted bicycle lanes, and traffic signals where needed.
D2: Redesign & Add Wayfinding to Foot-of-West-Hill Bike Facilities
Simplify and make safer connections between W MLK Jr and Hector St bike lanes to CWT, BDT extension, and potential Elm St bike lane (Project D1). Add wayfinding signage to make these connections even more visible.
E4: Create the Six Mile Creek Bridge Plaza
Convert one lane of Plain St bridge into plaza over creek with benches, trail info, public art, and add a cycle track along plaza curbside.
F3: Build Elmira Rd Protected Bike Lane to Spencer Rd
Upgrade bike lanes on Elmira Road to protected bike lanes or two-way cycle track from Plain St. to S Meadow St. Continue protected lanes across crosswalk at Meadow St., onto existing parklet by gas station, and to Meadow St.
A6: Implement Traffic Calming on Tioga St Bike Blvd
Build a roundabout at Lewis St. Build and diverters at Farm St and Tompkins St to lower vehicle speeds to 20 mph and stop thru-traffic.
D4: Build State St Protected Bike Lane (Meadow St to Downtown)
Connect Downtown to West End with protected lanes or two-way cycle track. Remove double-yellow line and use parked vehicles to buffer bike lanes.
E5: Build Six Mile Creek Trail (Plain St to Cayuga St)
Add diverters to encourage vehicles to use Albany and Cayuga Streets for thru-traffic. Create 11+ foot wide shared-use trail along creekside.
D5: Study & Pilot Test Downtown Ithaca Bike Circulation
Conduct a study focused on connecting the Fall Creeker, Waterfront Connector, Hill-to-Hill, and Six Mile Creek Trail together on existing downtown streets. Pilot test allowing slow bicycling (10 mph or less) along center of the Commons.