A8: Build University Ave Uphill Bike Lane
Implement changes planned by the City of Ithaca in 2018
A7: Upgrade Tioga Street with Protected Bike Lane (Farm St to Downtown)
Add a bike lane in preparation for the expected increase in vehicle traffic due to new Tompkins County office building.
A5: Paint Falls, Lincoln St Bike Lanes
Paint bike lanes to provide safer access from the Tioga St Bike Blvd to Ithaca Falls, Ithaca High School, and the Farmers Market (via the CWT).
A4: Extend Cayuga St Protected Bike Lane (Lincoln St to Downtown)
Protect existing bike lanes or combine into two-way cycle track on northbound side.
A2: Extend Trail on Boynton Middle School Grounds
Improve wayfinding on ICSD property and add additional sidewalk north of parking lot to connect with East Shore Drive and Project A1.
A1: Build NY Route 13 Underpass Shared-Use Trail
Convene a taskforce between NYSDOT, Town of Ithaca, CWT, ICSD, and City of Ithaca. Upgrade gravel walkway to 11+ feet wide sidewalk, tighten all turning radii, and add lighting and public art where feasible.
A3: Pilot Test Cayuga St Protected Bike Lane (IHS to Lincoln St.)
Pilot test protected bike lane (either two-way or one on each side) and improve connection to IHS-Boynton Trail.
A6: Implement Traffic Calming on Tioga St Bike Blvd
Build a roundabout at Lewis St. Build and diverters at Farm St and Tompkins St to lower vehicle speeds to 20 mph and stop thru-traffic.