D5: Study & Pilot Test Downtown Ithaca Bike Circulation

This is a Route A: Fall Creeker high priority project along Tioga St.

  • Conduct a study focused on connecting the Waterfront Connector, Hill-to-Hill, and Six Mile Creek Trail together on existing streets

  • Pilot test allowing slow bicycling (10 mph or less) along center of the Commons

Previous
Previous

E5: Build Six Mile Creek Trail (Plain St to Cayuga St)