D1: Conduct Feasibility Study of Elm Street Bike Lanes
Conduct study to determine how to serve southern West Hill residential areas with bike infrastructure, in particular West Village Apartments.
D3: Build State St Protected Bike Lane (Floral Ave to Meadow St)
Upgrade existing bike lane to a protected or raised bike lane due to heavy traffic flows
D2: Redesign & Add Wayfinding to Foot-of-West-Hill Bike Facilities
Simplify and make safer connections between W MLK Jr and Hector St bike lanes to CWT, BDT extension, and potential Elm St bike lane (Project D1). Add wayfinding signage to make these connections even more visible.
D4: Build State St Protected Bike Lane (Meadow St to Downtown)
Connect Downtown to West End with protected lanes or two-way cycle track. Remove double-yellow line and use parked vehicles to buffer bike lanes.
D5: Study & Pilot Test Downtown Ithaca Bike Circulation
Conduct a study focused on connecting the Fall Creeker, Waterfront Connector, Hill-to-Hill, and Six Mile Creek Trail together on existing downtown streets. Pilot test allowing slow bicycling (10 mph or less) along center of the Commons.