D2: Redesign & Add Wayfinding to Foot-of-West-Hill Bike Facilities

This is a Route D: Hill-to-Hill priority project.

  • Conduct study to determine the best way to interconnect W MLK Jr./State Street and Hector St bike lanes to the Black Diamond Trail extension and a potential bike lane up Elm Street.

  • Add wayfinding signage to make these connections more visible to people riding bikes

Previous
Previous

E3: Build Six Mile Creek Trail (Wegmans to Plain St)

Next
Next

F3: Build Elmira Rd Protected Bike Lane to Spencer Rd