F5: Build Access Paths Between Rt 13 and Spencer Rd
Create shared-use paths connecting Spencer Rd to Rt 13 every 800 feet (two city blocks); use vacant lots next to Honda and U-Haul property
F4a: Create Spencer Road Living Street
Repave Spencer Rd from S Meadow St to Salvation Army exit and enhance family-friendly feel of neighborhood by traffic calming road to 10 mph using chicanes, paving elements, and vegetation
F2b: Establish Titus Towers Creek Shared-Use Path
Create safe passageway from Meadow St to Plain St along Titus Towers property and NYSEG utility corridor
F4b: Establish Buttermilk Falls Shared-Use Entryway
Widen and pave existing footpath from Spencer Rd to Buttermilk Falls State Park parking lot, complete with signage
F1: Repave Plain and Wood St. Bike Boulevards
Repave bike boulevards to provide a safe riding surface
F2a: Fairgrounds Memorial Protected Bike Lane
Build two-way cycle track from Walmart to Meadow St. using one lane.
F3: Build Elmira Rd Protected Bike Lane to Spencer Rd
Upgrade bike lanes on Elmira Road to protected bike lanes or two-way cycle track from Plain St. to S Meadow St. Continue protected lanes across crosswalk at Meadow St., onto existing parklet by gas station, and to Meadow St.