People enjoying the Six Mile Creek Bridge Plaza. Conceptual rendering by Whitham Planning & Design, PLLC
The Six Mile Creek Trail links Downtown, Southside, and West Hill by building connections along quieter neighborhood streets. Along the way, the trail connects directly to Wegmans, a popular everyday destination which is currently poorly served by transportation alternatives to private vehicles. Because of this connection and the fact that this route will be directly linked with all other proposed routes, the Six Mile Creek Trail is expected to be a major east-west corridor. This trail is recommended within the most recent Southside Neighborhood Plan by the City of Ithaca and is one of the top priority projects of the Better Bike Network.
The extension of the Black Diamond Trail from Floral Avenue to Cherry Street via a new bridge is an exciting kickstart to the Six Mile Creek Trail route, providing West Hill residents a more direct, protected path to shopping destinations while avoiding the congested roads on Inlet Island. The trail is currently composed of informal footpaths along the creek on North and South Titus Streets. The Six Mile Creek Trail route could be upgraded to a shared-use path throughout, or a combination of wide sidewalks and on-street bike infrastructure appropriate for all ages and abilities.
Proposed Projects
Key Projects (Phase 0.5)
Connect Wegmans driveway to S Plain St with protected bike lane or shared use trail. Improve safety by adding signal priority and diverter at Meadow St. Repave parts of S Plain St.
Convert one lane of Plain St bridge into plaza over creek with benches, trail info, public art, and add a cycle track along plaza curbside.
Add diverters to encourage vehicles to use Albany and Cayuga Streets for thru-traffic. Create 11+ foot wide shared-use trail along creekside.
Phase 1 Projects
Conduct study to determine how to serve southern West Hill residential areas with bike infrastructure, in particular West Village Apartments.
Add painted or buffered bike lanes depending on traffic flow levels after implementing traffic calming measures at crossings (Project C3).
Create shared-use paths connecting Spencer Rd to Rt 13 every 800 feet (two city blocks); use vacant lots next to Honda and U-Haul property
Repave Spencer Rd from S Meadow St to Salvation Army exit and enhance family-friendly feel of neighborhood by traffic calming road to 10 mph using chicanes, paving elements, and vegetation
Create safe passageway from Meadow St to Plain St along Titus Towers property and NYSEG utility corridor
Expand public access to Cayuga Waterfront Trail by building a bike/ped railroad crossing at Cascadilla St and formalizing the crossing at Court St.
Build bridge over flood control channel, and extend existing wide sidewalk near Nate’s Floral Estates to new bridge and Wegmans
Add a bike lane in preparation for the expected increase in vehicle traffic due to new Tompkins County office building.
Phase 2 Projects
Extent Cayuga St protected bike lanes from downtown to connect separate portions of Six Mile Creek trail and the Chainworks redevelopment.