0
Skip to Content
Bicycling for Everyone
Home
Engineering
About Engineering
Better Bike Network
Routes & Projects
Community
Education
Encouragement
Equity & Access
Evaluation & Planning
Contact Us
Bicycling for Everyone
Home
Engineering
About Engineering
Better Bike Network
Routes & Projects
Community
Education
Encouragement
Equity & Access
Evaluation & Planning
Contact Us
Home
Folder: Engineering
Back
About Engineering
Better Bike Network
Routes & Projects
Folder: Community
Back
Education
Encouragement
Equity & Access
Evaluation & Planning
Contact Us
D1: Conduct Feasibility Study of Elm Street Bike Lanes
Route D: Hill-to-Hill Guest User 11/2/20 Route D: Hill-to-Hill Guest User 11/2/20

D1: Conduct Feasibility Study of Elm Street Bike Lanes

Conduct study to determine how to serve southern West Hill residential areas with bike infrastructure, in particular West Village Apartments.

Read More
F7b: Complete Meadow St Shared-Use Path (Elmira Dr to Salvation Army)
Route F: Southwest Shopper Trail Guest User 5/12/20 Route F: Southwest Shopper Trail Guest User 5/12/20

F7b: Complete Meadow St Shared-Use Path (Elmira Dr to Salvation Army)

Read More
F7a: Extend Meadow St Shared-Use Path (Cecil Malone Dr to Elmira Rd)
Route F: Southwest Shopper Trail Guest User 5/12/20 Route F: Southwest Shopper Trail Guest User 5/12/20

F7a: Extend Meadow St Shared-Use Path (Cecil Malone Dr to Elmira Rd)

Read More
C2: Implement Plain St Painted or Buffered Bike Lanes
Route C: Northside–Southside Guest User 5/12/20 Route C: Northside–Southside Guest User 5/12/20

C2: Implement Plain St Painted or Buffered Bike Lanes

Add painted or buffered bike lanes depending on traffic flow levels after implementing traffic calming measures at crossings (Project C3).

Read More
F6b: Build Off-Meadow Trail (Fairgrounds Memorial Parkway to Elmira Rd)
Route F: Southwest Shopper Trail Guest User 5/12/20 Route F: Southwest Shopper Trail Guest User 5/12/20

F6b: Build Off-Meadow Trail (Fairgrounds Memorial Parkway to Elmira Rd)

Read More
F6a: Build Off-Meadow Trail (Wegmans to Fairgrounds Memorial Parkway)
Route F: Southwest Shopper Trail Guest User 5/12/20 Route F: Southwest Shopper Trail Guest User 5/12/20

F6a: Build Off-Meadow Trail (Wegmans to Fairgrounds Memorial Parkway)

Read More
F5: Build Access Paths Between Rt 13 and Spencer Rd
Route F: Southwest Shopper Trail Guest User 5/12/20 Route F: Southwest Shopper Trail Guest User 5/12/20

F5: Build Access Paths Between Rt 13 and Spencer Rd

Create shared-use paths connecting Spencer Rd to Rt 13 every 800 feet (two city blocks); use vacant lots next to Honda and U-Haul property

Read More
F4a: Create Spencer Road Living Street
Route F: Southwest Shopper Trail Guest User 5/12/20 Route F: Southwest Shopper Trail Guest User 5/12/20

F4a: Create Spencer Road Living Street

Repave Spencer Rd from S Meadow St to Salvation Army exit and enhance family-friendly feel of neighborhood by traffic calming road to 10 mph using chicanes, paving elements, and vegetation

Read More
F2b: Establish Titus Towers Creek Shared-Use Path
Route F: Southwest Shopper Trail Guest User 5/12/20 Route F: Southwest Shopper Trail Guest User 5/12/20

F2b: Establish Titus Towers Creek Shared-Use Path

Create safe passageway from Meadow St to Plain St along Titus Towers property and NYSEG utility corridor

Read More
D3: Build State St Protected Bike Lane (Floral Ave to Meadow St)
Route D: Hill-to-Hill Guest User 5/12/20 Route D: Hill-to-Hill Guest User 5/12/20

D3: Build State St Protected Bike Lane (Floral Ave to Meadow St)

Upgrade existing bike lane to a protected or raised bike lane due to heavy traffic flows

Read More
B4. Construct Cascadilla, Court St Railroad Crossings
Route B: Waterfront Connector Guest User 5/12/20 Route B: Waterfront Connector Guest User 5/12/20

B4. Construct Cascadilla, Court St Railroad Crossings

Expand public access to Cayuga Waterfront Trail by building a bike/ped railroad crossing at Cascadilla St and formalizing the crossing at Court St.

Read More
B2: Build Third Street Protected Bike Lane
Route B: Waterfront Connector Guest User 5/12/20 Route B: Waterfront Connector Guest User 5/12/20

B2: Build Third Street Protected Bike Lane

Pilot test protected bike lane from Cascadilla St to CWT trailhead at the Ithaca Farmers Market to increase safety during peak hours and market days.

Read More
E6: Extend Cayuga St Protected Bike Lane to Chainworks
Route E: Six Mile Creek Trail Guest User 5/7/20 Route E: Six Mile Creek Trail Guest User 5/7/20

E6: Extend Cayuga St Protected Bike Lane to Chainworks

Extent Cayuga St protected bike lanes from downtown to connect separate portions of Six Mile Creek trail and the Chainworks redevelopment.

Read More
E1: Build Cecil Malone Shared-Use Path
Route E: Six Mile Creek Trail Guest User 5/7/20 Route E: Six Mile Creek Trail Guest User 5/7/20

E1: Build Cecil Malone Shared-Use Path

Build bridge over flood control channel, and extend existing wide sidewalk near Nate’s Floral Estates to new bridge and Wegmans

Read More
E2: Formalize Lehigh Valley Shared-Use Path
Route E: Six Mile Creek Trail Guest User 5/7/20 Route E: Six Mile Creek Trail Guest User 5/7/20

E2: Formalize Lehigh Valley Shared-Use Path

Formalize shortcut and link to rehabilitated bridge

Read More
Route B: Waterfront Connector Guest User 5/7/20 Route B: Waterfront Connector Guest User 5/7/20

B5: Paint Court St Bike Lane (Fulton St to University Ave)

Paint bike lane connecting Cayuga Waterfront Trail to University Ave uphill bike lane for confident bicycle users

Read More
C4: Build Meadow St Shared-Use Path (Third St to Cecil Malone Dr)
Route C: Northside–Southside Guest User 5/7/20 Route C: Northside–Southside Guest User 5/7/20

C4: Build Meadow St Shared-Use Path (Third St to Cecil Malone Dr)

Test allowing bicycling on Meadow and Fulton Street sidewalks

Read More
A8: Build University Ave Uphill Bike Lane
Route A: Fall Creeker Guest User 5/6/20 Route A: Fall Creeker Guest User 5/6/20

A8: Build University Ave Uphill Bike Lane

Implement changes planned by the City of Ithaca in 2018

Read More
A7: Upgrade Tioga Street with Protected Bike Lane (Farm St to Downtown)
Route A: Fall Creeker Guest User 5/6/20 Route A: Fall Creeker Guest User 5/6/20

A7: Upgrade Tioga Street with Protected Bike Lane (Farm St to Downtown)

Add a bike lane in preparation for the expected increase in vehicle traffic due to new Tompkins County office building.

Read More
A5: Paint Falls, Lincoln St Bike Lanes
Route A: Fall Creeker Guest User 5/6/20 Route A: Fall Creeker Guest User 5/6/20

A5: Paint Falls, Lincoln St Bike Lanes

Paint bike lanes to provide safer access from the Tioga St Bike Blvd to Ithaca Falls, Ithaca High School, and the Farmers Market (via the CWT).

Read More
Older Posts

BICYCLING FOR EVERYONE
An Action Plan for
Ithaca & Tompkins County

Created with ♥ by Bike Walk Tompkins

We want to hear what you think.
Give us your feedback!

Engineering

About
Better Bike Network
Routes & Projects

Community

Encouragement
Education
Equity & Access
Evaluation & Planning

This project was supported by NYSERDA & NYSDOT.
Conceptual renderings courtesy of Whitham Planning & Design.
© 2021 The Center for Community Transportation.