F2b: Establish Titus Towers Creek Shared-Use Path
Create safe passageway from Meadow St to Plain St along Titus Towers property and NYSEG utility corridor
D3: Build State St Protected Bike Lane (Floral Ave to Meadow St)
Upgrade existing bike lane to a protected or raised bike lane due to heavy traffic flows
E1: Build Cecil Malone Shared-Use Path
Build bridge over flood control channel, and extend existing wide sidewalk near Nate’s Floral Estates to new bridge and Wegmans
E2: Formalize Lehigh Valley Shared-Use Path
Formalize shortcut and link to rehabilitated bridge
B5: Paint Court St Bike Lane (Fulton St to University Ave)
Paint bike lane connecting Cayuga Waterfront Trail to University Ave uphill bike lane for confident bicycle users
A8: Build University Ave Uphill Bike Lane
Implement changes planned by the City of Ithaca in 2018