D3: Build State St Protected Bike Lane (Floral Ave to Meadow St)
Upgrade existing bike lane to a protected or raised bike lane due to heavy traffic flows
B2: Build Third Street Protected Bike Lane
Pilot test protected bike lane from Cascadilla St to CWT trailhead at the Ithaca Farmers Market to increase safety during peak hours and market days.
E6: Extend Cayuga St Protected Bike Lane to Chainworks
Extent Cayuga St protected bike lanes from downtown to connect separate portions of Six Mile Creek trail and the Chainworks redevelopment.
B5: Paint Court St Bike Lane (Fulton St to University Ave)
Paint bike lane connecting Cayuga Waterfront Trail to University Ave uphill bike lane for confident bicycle users
C4: Build Meadow St Shared-Use Path (Third St to Cecil Malone Dr)
Test allowing bicycling on Meadow and Fulton Street sidewalks
A4: Extend Cayuga St Protected Bike Lane (Lincoln St to Downtown)
Protect existing bike lanes or combine into two-way cycle track on northbound side.